Bathroom floor retile

This is everything a DreamDIY project gives you, on a real bathroom job — the materials with prices, the phased plan, the pro tips and the making-good list. Nothing here is behind a sign-up.

A worked example, not a customer's project. Your plan is generated from your own photo and the design you choose.

Before
After
Rip out the tired vinyl and lay grey hexagon porcelain tiles with white grout, then re-seal around the bath.
Cost
£168-£286
Time
2-3 days
Difficulty
Intermediate
Steps
10 across 3 phases

What you'd buy

ItemQuantityTypical price
Grey hex porcelain floor tiles7 m² (plus 10% wastage)£45-£120
Flexible tile adhesive2 × 20 kg bags£16-£24
White floor grout1 × 5 kg bag£8-£14
Cement backer board3 sheets£24-£36
Tile spacers (3 mm)1 pack of 250£3-£4
PVA primer1 litre£5-£8
Silicone sealant (white)2 tubes£5-£9
Tiling tool kit (notched trowel, float, sponge)1 kit£18-£30
Materials total, cheapest option£124-£245

Estimate — add 10% wastage and check before you buy. In the app these become measured quantities and real pack counts once you tell us the room size.

The plan, step by step

Prep the floorDay 1

  1. Clear the room and lift the old floor covering

    Scrape back any old adhesive so you're working on a sound, flat surface.

  2. Check the floor is level

    Anything deeper than 3 mm wants self-levelling compound before you tile.

    Lay a spirit level across the floor in both directions and mark the dips in pencil - it's much easier than finding them with a trowel full of adhesive.

  3. Lay cement backer board over the floorboards

    Screw every 20 cm and stagger the joints so nothing flexes underfoot.

  4. Prime the boards with PVA and let them dry

Lay the tilesDays 1-2

  1. Dry-lay from the centre of the room

    Plan your cuts so you don't end up with slivers at the doorway.

    Buy 10-15% more tiles than the measured area. Cuts and breakages are normal, and tiles from a later batch can be a visibly different shade.

  2. Spread adhesive one square metre at a time

    Hold the notched trowel at a consistent 45°.

  3. Lay outward with spacers, checking level as you go

    Hire a decent tile cutter for the day (about £20) instead of buying a cheap one - hex tiles punish a bad cut.

  4. Leave it 24 hours to cure

    No foot traffic at all. Plan for the other bathroom, or an early night.

Grout and finishDays 2-3

  1. Grout the joints

    Press in firmly at 45°, then wipe the excess with a damp sponge before it sets.

  2. Seal the perimeter with silicone

    A neat bead where the tiles meet the wall and the bath.

    Run masking tape either side of the gap, lay the bead, smooth it with a wet finger, then pull the tape before it skins. It's the difference between a DIY finish and a professional one.

Making good

Caulk the join between the skirting and the new floor, touch in the paint where the old covering came away, and run a bead of silicone around the bath foot. Making good is what separates a finished room from a finished job.